Participating WZQ Team: Chongqing University, Technological and Higher Education Institute of Hong Kong
No. of participants: 50 university students (Hong Kong and Mainland China)
Project Sponsorship: hpa 何設計
Project category: Two-storey building of dining hall
Beneficiary villagers: 1523
Time: March 2019 - January 2022


Main construction of the canteen building - August 2021-January 2022
- Affected by the epidemic and various local construction coordination, the project was postponed to August 2021 to officially start construction
- The project was contracted and constructed by a local construction engineering company, and the main structure both interior and exterior decoration works have been completed
今日春和日麗,柴米小築與你再相見 2022/03/29
琴棋村--柴米小築建造記 2022/01/19
用一座食堂,溫暖一個鄉村 2021/11/13

Construction Site Clearance - May-July 2021
- Level the construction site
- Coordinate with the government power department to remove poles, lights and other installations on the site for construction

Project Construction Inspection - March 27-29, 2021
Particating WZQ Team: Chongqing University
Number of participants: 4 (including students and staff)
- After confirming the construction engineering company, the team entered the village to conduct technical exchanges with the construction team and explained the ideas of the design
- Team checks on construction site preparation progress
- Communicate with the village committee to understand the project progress and construction arrangements

Field Geological Survey - November 17-19, 2020
- Before construction, hire a local engineering company to conduct geological survey of the construction site to ensure the feasibility and safety of the construction
無止橋首個食堂建設項目 2021/02/02
.jpg?v1.81)
Project design and construction drawing preparation - December 2019 - September 2020
- According to the research results, the team improves the architectural design details and determines the design plan
- Invite Chongqing Hefang City Planning Design Company to voluntarily produce construction drawings and iterate revisions
心繫鄉村,共築琴棋 | 答謝何方贊助紀實暨項目展望 2020/09/08
.jpg?v1.81)
The Second Investigation - October 25-29, 2019
Participating WZQ Team: Chongqing University, Technological and Higher Education Institute of Hong Kong
Number of participants: 10 (including students and staff)
- The team discusses the design plan with the village committee and conducts a more comprehensive site survey to test the feasibility of the preliminary design
- Further collection of site data to refine design details
- Discuss with the village committee and the local construction team about specific construction arrangements
- Investigate the building materials market and related logistical arrangements
.jpg?v1.81)
The First Investigation - June 25-28, 2019
Participating WZQ Team: Chongqing University, Technological and Higher Education Institute of Hong Kong
Number of participants: 11 (including students, staff and sponsors)
- The team has a preliminary understanding of the village environment and an overview of the village
- Collect demand and measurement data for canteen construction sites
- Discuss people's livelihood needs to prepare livelihood plans
- Investigate the supporting and arrangement of the follow-up construction process
琴棋村項目一調與方案征集 2019/08/10