Monthly Archives: January 2013

Aug 2010

As the village had experienced heavy downpour last year, and the flood water further damaged the bridge structure, Foundation decided to rebuild the b…

Posted in Milestones | 1,707 Comments

Aug 2009

Close to 80 professionals and student volunteers mainly both Hong Kong and Mainland Universities and a volunteer team from New World Development Co Lt…

Posted in Milestones | 1,407 Comments

Apr 2009

Project team conducted testing for construction procedures to double check the construction feasibility in April.

Posted in Milestones | 292 Comments

Dec 2008

Bridge Design Competition result was finalized in early Dec. With approval from Foundation, the design by the champion from the 1st Group will be adop…

Posted in Milestones | 958 Comments

Nov 2008

The Architecture Department of XUAT conducted a bridge design competition in Nov 08. Total 25 designs were collected.

Posted in Milestones | 328 Comments

Apr 2008

XUAT conducted the 1st survey trip in Apr.

Click here for survey report (Chinese version only).

Posted in Milestones | 2,229 Comments

Oct 2010

More than 50 professional and student volunteers mainly from Hong Kong and Mainland succcesfully built a 30 meters long footbridge for the locals in L…

Posted in Milestones | 1,112 Comments

Aug 2010

Project team finalized the bridge design and relevant construction drawings in Aug.

Posted in Milestones | 233 Comments

Apr 2010

XJU conducted the 1st survey trip in Apr.

Click here for survey report (Chinese version only).

Posted in Milestones | 339 Comments